Loading of wind towers on a ship
Data: 11.05.2022
The location of the wind tower section production on Ostrow Island with access to the quay provides a direct possibility of loading and shipping the finished products by sea. The wind towers manufactured by Baltic Operator for the construction of an onshore wind farm in Finland are being prepared for loading onto the ship. Each wind tower section has been equipped according to individual specifications provided by our client. The average weight of the sections shown in the picture is 53 tons.